Hopewell Elementary

We purchased almost 272 acres of land at 68th Street and Waukomis Drive, on the eastern edge of our district, for $3 million. This purchase is a result of the long-range, enrollment-based facilities plan the Board developed with input from staff, students, parents and community members. 

As called for in our long-range plan, our new site will house our next elementary school and a facility for our high-school students. Hopewell Elementary will open in 2019.

The size of this land and the designs for the high-school facility will allow us to build onto it to make a full high school at this location if we have enough enrollment growth in the future.

Hopewell design

Hopewell design update (PDF)

Hopewell design

live Construction video  

Universal Construction's live time-lapse video of construction
  • To watch live time-lapse video from the construction site, visit the link and click on the icon of the three lines in the left corner and press the two play buttons on the bottom.

Groundbreaking

Hopewell groundbreaking photo album



 View or download the site master plan (PDF) below.

download site master plan (PDF)